grandemilenaa06 grandemilenaa06
  • 12-03-2021
  • Mathematics
contestada

if 9 men can complete a job in 4 days, how long will 8 men take to complete the same job, assuming that all the men are working at the same rate?

Respuesta :

irspow
irspow irspow
  • 12-03-2021

Answer:

Step-by-step explanation:

8t=9(4)

8t=36

t=4.5

So it will take 4.5 days for 8 men to finish the job.

Answer Link

Otras preguntas

Susan made 75 pieces of peanut brittle to share equally with her friends. She put 4 pieces of peanut brittle in each bag. She gave all the left over pieces of p
— what day do you leave?
solve the equations 3/4x = 21
Faire le calcul de (5x7)+(12/4)-8=
PLZ HELLLP 50 POINTS, WILL GIVE BRAINLY PLZZZZZZZZZZ Modified organisms may contaminate the natural, wild populations. Which genetic technique is the statement
How do different economic sections of society deal with water scarcity? Who is the most vulnerable to water scarcity?
Please help me answer these question
If a star is moving toward Earth, it is O A. blue shifted O B. shrinking O C. red shifted O D. expanding
Complete the statement. Round the nearest hundredth if necessary. 6.5L=. Gal
what happens to the state of motion of the object, when you don't exert a force on it???​