jacobnewcomb jacobnewcomb
  • 10-03-2021
  • Mathematics
contestada

A building company completes 42 homes every 2 months.

At this rate, how many homes can the company complete in 6 months?

Respuesta :

ace5713
ace5713 ace5713
  • 10-03-2021

126

Step-by-step explanation:

the ratio is 2months- 42 homes

6-126 = (2-42)x3

Answer Link
zerotwolover69 zerotwolover69
  • 12-05-2022

Answer:

the answer is a or b

Step-by-step explanation:

Answer Link

Otras preguntas

In ancient times European trade with Asia along the
another man joins each end if the rope Dose this affect the results of the tug of war if not why or why not
just 6, 7 and 8 please many points
You sell tickets for a fundraiser. You give half of the tickets to your sister to sell. You sell 25 of your half of the tickets and have 17 left. How many ticke
I like birds in Spanish
Who Built the Pyramids? The pyramids of Egypt are truly an amazing sight. The tallest, known as the Great Pyramid, was close to 500 feet tall when it was built
Why did the English colonists have more self government than the colonists of New France
Which viarible is indepent and dependent in this eqution, P=3.5b-84
What is the equation of a line that passes through the point (8, 1) and is perpendicular to the line whose equation is y=−2/3x+5 ? Enter your answer in the box
Which word is the strongest and which one is weakest? Dreary or Lugubrious?