if 3 people can complete a job in 4 days, how many days will it take to complete the job with 5 people?

Respuesta :

briangetalla briangetalla
  • 12-12-2020
2.4 days because 3x4=12/5 =2.4
Answer Link

Otras preguntas

Is clever a positive or negative connotation?
A top-down strategic plan generally takes place in which type of organization?
What are the foreign policy powers of the president?
Determine if the expression -2c + cd √6-5c4d is a polynomial or not. If it is a polynomial, state the type and degree of the polynomial. The given expression |
Given a graph of friends who have different interests, determine which groups of friends have the most interests in common. Then use a little math to determine
What is conceptual terms in research?
Know The difference between a 1n and 2n cell
Jannah places a rectangle in the coordinate plane so that the lower left vertex is at the origin and the longer side of the rectangle is along the x-axis. Janna
When chronically ill women are married, _____ unlike their husbands.
Given the linear function g(x)= 1/4x-2, which domain value corresponds to the range value of 1/8?