alcatrazmango3664 alcatrazmango3664
  • 10-02-2020
  • Social Studies
contestada

In slab placement, what comes directly before concrete floating? Select one: a. Formwork placement b. Curing c. Troweling d. Pouring e. Strike-off

Respuesta :

bratislava bratislava
  • 11-02-2020

Answer:

e. Strike-off

Explanation:

  • The precast suspended slabs are considered by pouring the slabs in a framework of the slabs and then lifting the slabs into suspended postilions in the structure.
Answer Link

Otras preguntas

Evaluate the expression: 7 to the -5th power multiplied by 7 to the 3rd power.
How is temperature related to the physical change of asubstance​
find the multiplicative inverse, or reciprocal, of 5/9?
An acropolis was a central meeting center for ancient Greeks.A. TrueB. False​
What is the equation of the graphed line in point-slope form?
What was the Southeast Asia Treaty Organization?
given that (-7,1) is on the graph of f(x), find the corresponding point for the function 3f(x)
1.Employees provide the ____line of defense to security breaches?
what was another name for the French and Indian war
Where was the battle of bunker hill fought