a contractor is mixing concrete and mixed 3 parts concrete and 9 parts water. How much water is needed for 12 parts concrete?

Respuesta :

sakie329 sakie329
  • 12-12-2018

Answer:

36 parts water

Step-by-step explanation:

3/9 = 1/3 = for every 1 part concrete, it's 3 parts water.

12/x = 1/3; x = 36

so, 12 x 3 = 36

Answer Link

Otras preguntas

why does the threat of the atomic bomb not seem so bad at the beginning of the video ​
what was the intended purpose of the equal rights amendment
What is the range of the data set? Enter the answer in the box. !THIS IS NOT SOMETHING THAT YOU NEED TO ANSWER I HAVE THE ANSWER, THE ANSWER IS 13 THANK YOU F
is paid an annual salary of $26,000. Find the Pat's weekly salary
Your friend is going on vacation to South America- In 5 complete Spanish sentences tell him what transportation not to take. Be sure to use 4-5 different modes
If you were doing research on what scientists had discovered about the cancerous effects of a chemical fertilizer known as Ditriculate, which source would be th
Brainliest is waiting
Need help with this one.
Match each country with the leader of its independence movement. Toussaint L’Ouverture Miguel Hidalgo José de San Martín Simón Bolívar
A person pushes a crate up a 4-m high ramp for a distance of 18m. a) What is the mechanical advantage of the ramp? b) How hard does the person have to push if